Lean Management Vs Just In Time Sample Presentation Slides

Rating:
90%
Instant
Download
100%
Editable
Compatible with
google slide
Favourites
Loading...

Features of these PowerPoint presentation slides:

This is a lean management vs just in time sample presentation slides. This is a three stage process. The stages in this process are traditional manufacturing vs lean manufacturing, activity, inventory level, suitability, higher product design, cost of production, bundle size, process waste, product inspection, work in progress, production type, layout, traditional, for high order quantity, not suitable, high, low, sample based inspection, stock production, functional layout, lean, low level, for low order quantity, highly suitable, 100 percent inspection, custom production, product layout.

People who downloaded this PowerPoint presentation also viewed the following :

Ratings and Reviews

90% of 100
Write a review

Most Relevant Reviews

  1. 80%

    by deval

    Informative presentations that are easily editable.
  2. 100%

    by JAMES

    I discovered this website through a google search, the services matched my needs perfectly and the pricing was very reasonable. I was thrilled with the product and the customer service. I will definitely use their slides again for my presentations and recommend them to other colleagues.
per page: