Budget Cost Project Plan Project Cost Breakdown Of Material And Equipment Slides PDF
- Google Slides is a new FREE Presentation software from Google.
- All our content is 100% compatible with Google Slides.
- Just download our designs, and upload them to Google Slides and they will work automatically.
- Amaze your audience with SlideGeeks and Google Slides.
-
Want Changes to This PPT Slide? Check out our Presentation Design Services
- WideScreen Aspect ratio is becoming a very popular format. When you download this product, the downloaded ZIP will contain this product in both standard and widescreen format.
- Some older products that we have may only be in standard format, but they can easily be converted to widescreen.
- To do this, please open the SlideGeeks product in Powerpoint, and go to
- Design ( On the top bar) -> Page Setup -> and select "On-screen Show (16:9)” in the drop down for "Slides Sized for".
- The slide or theme will change to widescreen, and all graphics will adjust automatically. You can similarly convert our content to any other desired screen aspect ratio.
Compatible With Google Slides
Get This In WideScreen
You must be logged in to download this presentation.
Download
Editable
google slide
Features of these PowerPoint presentation slides:
Deliver an awe-inspiring pitch with this creative budget cost project plan project cost breakdown of material and equipment slides pdf bundle. Topics like name of materials or equipment, price per unit, no. of units needed, total amount can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.
People who downloaded this PowerPoint presentation also viewed the following :
Budget Cost Project Plan Project Cost Breakdown Of Material And Equipment Slides PDF with all 2 slides:
Most Relevant Reviews
-
Much better than the original! Thanks for the quick turnaround.